Skip to content

First Avenue Bridge

Bascule drawbridge

First Avenue Bridge is a bascule drawbridge with 22 ft of clearance closed, measured to mean high water. Its open clearance is not charted.

Closed clearance
22 ft
at mean high water
Open clearance
Not charted
none on NOAA's chart
Horizontal
145 ft
channel width
Location
47.542°, -122.335°
Washington

Clearances are from NOAA chart US5WA15M, measured to mean high water. Actual clearance is lower whenever the water stands above that level, as at higher tides and in storm surge. Always confirm against your vessel's air draft and the posted clearance gauge before transiting.

Pathr nautical charts

First Avenue Bridge on the chart

Find the bridge and its charted vertical clearance in one view. Select a pin to compare nearby bridges, see open and closed clearances where charted, and open its operating details.

Explore this coast on Pathr’s nautical chart.
Selected location: First Avenue Bridge, 47.5421°N · 122.3345°W.

How to request an opening

Hail on VHF-FM
Channel not listed
not in the bridge's rule
Bridge tender
Sound signal
No published phone. Use VHF or a horn signal.
Advance notice
See the rule
operating schedule below
Operating schedule

the draws of the First Avenue South Bridges, mile 2.5, need not be opened for the passage of vessels from 6 a.m. to 9 a.m. and from 3 p.m. to 6 p.m., except: The draws shall open at any time for a vessel of 5000 gross tons and over, a vessel towing a vessel of 5000 gross tons and over, and a vessel proceeding to pick up for towing a vessel of 5000 gross tons and over.

Source: US Coast Guard drawbridge regulations, 33 CFR 117.1041 (Duwamish Waterway). Confirm before transiting.

Know every bridge before you get there

Pathr checks First Avenue Bridge and every bridge on your route against your boat's air draft, using NOAA charted clearance (automatic route planning is Premium). Free on iPhone and Android. Two months of Premium free.

Frequently asked

What is the clearance under First Avenue Bridge?+

First Avenue Bridge is a bascule drawbridge with 22 ft of clearance closed, measured to mean high water. Its open clearance is not charted. These figures are from NOAA chart data. Real clearance drops whenever the water stands above the level they are measured to, so leave a margin for your air draft.

How do I get First Avenue Bridge to open?+

Contact the bridge tender on VHF-FM, or sound the required signal. Operating schedule: the draws of the First Avenue South Bridges, mile 2.5, need not be opened for the passage of vessels from 6 a.m. to 9 a.m. and from 3 p.m. to 6 p.m., except: The draws shall open at any time for a vessel of 5000 gross tons and over, a vesse

Tides & conditions at this crossing

Clearance under First Avenue Bridge shrinks as the water rises. Check the water level and marine conditions at the nearest NOAA station, Duwamish Waterway, Eighth Ave. South (1 mi away).

Nearby bridges

Free on iPhone and Android

You've got the data. Now put it on your chart.

Pathr puts official NOAA chart data, the tide and the wind on one chart, and the charts work offline.

Premium adds route planning, radar and AIS. New accounts get two months of Premium free.

Optional

Did this tool help?

We build these for the boating community and keep them free, no signup and no ads. If it saved you some time, you can chip in toward the next one.

One-time, secure checkout by Stripe. No account, no subscription. It’s a tip to a small company, so it isn’t a tax-deductible donation.

Free

Or pass it along

Sending this to one boater who needs it helps us more than a few dollars does.

Want to see something in the next tool?

Got a tool you wish existed, or a change to this one? Tell us and we'll build it.

Contact us