Broadway Bridge is a bascule drawbridge with 90 ft closed, opening to unrestricted height.
Clearances are from NOAA charts, referenced to mean high water. Actual clearance is lower at higher tides and storm surge. Always confirm against your vessel's air draft and the posted clearance gauge before transiting.
(3)(i) Broadway Bridge, mile 11.7, from 8 a.m. to 5 p.m. Monday through Friday, one hour's notice shall be given for draw openings. At all other times, notice of at least two hours in advance is required. (ii) Steel Bridge (upper deck only),
Source: US Coast Guard drawbridge regulations, 33 CFR 117.897 (Willamette River). Confirm before transiting.
Broadway Bridge is a bascule drawbridge. Its closed vertical clearance is about 90 ft, and it opens to unrestricted height. Heights are referenced to mean high water (MHW).
Contact the bridge tender on VHF-FM Channel 13, or sound the required signal. Operating schedule: (3)(i) Broadway Bridge, mile 11.7, from 8 a.m. to 5 p.m. Monday through Friday, one hour's notice shall be given for draw openings. At all other times, notice of at least two hours in advance is required. (ii) Steel Bridge (upper deck only)
Pathr shows this spot live on a nautical chart, the depth under your keel, wind, tide, and live AIS traffic, all in one place.
Love the free tools? Back us as a Founding member.
