Union Pacific Railroad Lift Bridge is a lift drawbridge with 70 ft closed and 135 ft open.
Clearances are from NOAA charts, referenced to mean high water. Actual clearance is lower at higher tides and storm surge. Always confirm against your vessel's air draft and the posted clearance gauge before transiting.
The draws of the Union Pacific railroad bridge, mile 1.5 at Suisun, shall open on signal if at least 24 hours notice is given.
Source: US Coast Guard drawbridge regulations, 33 CFR 117.151 (Cordelia Slough (a tributary of Suisun Bay)). Confirm before transiting.
Union Pacific Railroad Lift Bridge is a lift drawbridge. Its closed vertical clearance is about 70 ft, opening to about 135 ft. Heights are referenced to mean high water (MHW).
Contact the bridge tender on VHF-FM Channel 13, or sound the required signal. This bridge requires at least 24 hours advance notice. Operating schedule: The draws of the Union Pacific railroad bridge, mile 1.5 at Suisun, shall open on signal if at least 24 hours notice is given.
Pathr shows this spot live on a nautical chart, the depth under your keel, wind, tide, and live AIS traffic, all in one place.
Love the free tools? Back us as a Founding member.
